Currently, automatic barriers or baries are widely used for the purpose of controlling security and order in and out of areas such as companies, industrial parks, etc., and are often used together with systems. of the parking lot. Installing an automatic barricade is not too complicated. This article will show you how to install an automatic barrier barrier simply and quickly.
Instructions on how to install a full automatic Barie, easy to follow
Step 1: Prepare materials and equipment
One of the first steps before going to install the barrier is to prepare the necessary materials and equipment. Prepare everything ready and complete to avoid shortages or unorganized situations leading to loss of time, causing many difficulties.
Some equipment and tools commonly used in the installation of barium bars include specialized drills, drill bits, screwdrivers, screwdrivers, electric testers, alkalis, hammers... with actual dimensions. depending on the type of barie installed, prepare accordingly. With the gate part of the barie, it is necessary to prepare a power cord with 2 * 2.5 daphaco power, 4 * 0.5 sanjin signal wire to ensure high power stability for safety, automatic circuit breaker.
Step 2: Prepare the ground
The ground used to install the barie needs to be thoroughly checked, to make sure that after the bar is installed, it will ensure its stability, without shaking or unstable. For places where the ground is used with flat concrete, it is not necessary to pour more pillars or flatten it anymore, saving quite a bit of time and effort. In places where the position of the ground is not good such as sand, soft soil, brick foundation, etc., it is best to add concrete pillars to use as a fixed base for the barie, to ensure that it is not confused or falls in use process.
Dimensions of the barie stand are standard with dimensions length x width x height = 400 x 400 x 400 mm.
Step 3: Install the barie
- Proceed to install the barie on the prepared poles
- Mark the hole and then use the drill to drill the hole to help fix the barium pillar to the concrete
- Put the electric barie post on and proceed to tighten the switch positions
- Finally, install the arm of the automatic barie to the cylinder body.
Step 4: Connect the wiring to the control box barie
Carefully check and determine exactly where is the hot wire and where is the cold wire so that when connecting to the main, there is no problem. Next, proceed to connect the hot wire to the AC_L pin and the remaining cold wire to connect to the AC_N pin.
Some notes when installing Barie need to remember
Disconnect all power sources related to the installation system before installing the barie to ensure absolute safety for everyone during the construction process.
It is necessary to ground from the barie pole to minimize the danger from possible electric leakage.
The power cord used to install the barie gate must be a 2*2.5 daphaco power cord with high stability.
With the specifications inside the existing barium cylinder that have been fine-tuned and safely tested by experts, it is best not to change any details without expertise. Contact technical or manufacturer for best support.
The operating principle of the barie will normally be based on the main power source. But in case of power failure, this mechanism will switch to a mechanical lock for opening and closing and will convert to an electric lock after the power is restored.
Use the remote control to control the barie bars with buttons that manufacturers have built-in necessary features.
A rather important note is that absolutely do not open the barie post when the barie handle is in an active state, to avoid causing damage to the device.
The best barie supplier and installer today
In fact, not too many customers have enough knowledge about automatic barie products like this. Therefore, to get products with good quality, and attractive after-sales, you should look to reputable product supply experts for support.
Anh Khoa Company is proud to be one of the distributors and dealers of automatic barie products, installed on-site with the best quality and warranty as well as long-term support. Cuatudonganhkhoa.com is the main cooperation unit of many partners from Korea, Japan, Germany, Italy... and with a team of experienced and well-trained staff, promises to bring customers many interesting experiences. and most reliable.